FoundationGenerally reinforced concrete driven-in pile foundation
StructureGround floor: cast-in-situ RC column-beam-slab frame; typical floors: flat slab, cast-in-situ RC column-beam frame with post-tensioned slab system
RoofFlat slab design — cast-in-situ RC column-beam frame with post-tensioned slab system
External WallRC / lightweight concrete panel / block wall with skim coat and painting; unitized curtain wall system; aluminium cladding
Internal WallLightweight concrete panel / block wall / impact-resistant drywall with skim coat and emulsion paint; porcelain wall tiles to 2,400 mm in toilets
WindowsAluminium-framed glazing / aluminium louvres / aluminium-framed window system with glazing/aluminium screen
DoorsUnits: metal door and frame with paint finish; toilets: flush timber door with lockset in laminate finish
CeilingUnits: emulsion paint finish; lift lobbies/common areas: plaster ceiling / emulsion paint / aluminium ceiling
Floor FinishesUnits: broom finish concrete; toilets and lift lobbies/common areas: homogeneous/porcelain tile
Floor LoadingClean industrial units 7.5 kN/m²; driveway & carpark 7.5 kPa; aircon ledges 1.5 kPa; toilet/lobby/staircase 3.0 kPa
Floor-to-Floor Height1st storey 6.5 m; 2nd to 7th storey 6.3 m
Electrical Supply100 A/3-phase isolator for units #01-01, #01-02, #01-03 & #07-07; 60 A/3-phase for all other units; solar PV provision for common areas
Air-Conditioning / MechanicalUnits: natural or mechanical ventilation; lift lobbies/common areas: air-conditioning and/or mechanical ventilation per authority requirements
Lifts1 service lift and 2 passenger/fire lifts
Plumbing & SanitaryAccessible toilets in compliance with statutory requirements; private attached toilet in every clean industrial unit
Fire ProtectionSprinkler, manual & automatic fire alarm, dry risers, hose reels, extinguishers, voice communication, emergency lighting and exit signs per statutory requirements
TelecommunicationCable tray / trunking / conduit infrastructure in compliance with IMDA requirements
Lightning ProtectionLightning protection system provided in compliance with statutory requirements
Loading Bays2 loading bays and 1 heavy vehicle lot at 1st storey; common loading/unloading areas at 2nd & 3rd storey
Parking23 car spaces at 1st/2nd/3rd storey incl. 4 EV lots; 2 accessible car spaces; 1 motorcycle lot; 28 bicycle lots at 1st storey
Refuse DisposalBin centre at 1st storey
Specifications are from the official brochure and are subject to change as may be required by the developer or the relevant authorities.
The section below shows how the specifications translate into the building: ramp-up access serving the lower storeys, flatted factory floors from the 4th to 7th storeys, and floor-to-floor heights of 6.5 m on the 1st storey and 6.3 m above.